Commit Graph

11 Commits

Author SHA1 Message Date
Jon Chery 4fe1a1508e docs(P00): grill — v1.27 adversarial review (6 challenges, PROCEED 0.88)
Nova Slides Render / render (push) Failing after 26s
6 challenges; 0 escalations; 1 binding revision (G-Q2, already in
PLAN): archive list refined to 7 platform + 1 consumer = 8 files
(the 4 pre-execution files stay active through v1.27 holding the P0
content; v1.26-era content in git history).

Challenges:
- G-Q1: archiving AUTONOMY_THESIS + COST is lossless (folded into
  NORTH_STAR; COST predates v1.26 pilot)
- G-Q2: archive-list ambiguity resolved (the refinement above)
- G-Q3: STATE.md backfill accuracy ensured by P1 W1 verification step
- G-Q4: NFR purity holds (STATE.md is docs, not feat)
- G-Q5: PROJECT.md bug fix in P2 is intentional phasing (D-225)
- G-Q6: milestone scope is appropriately small + high-leverage

---ci---
project: acdl
phase: 0
milestone: v1.27
status: grill
---ci---
2026-08-19 19:12:37 +00:00
Jon Chery cf8aa53c8d docs(P00): grill — v1.26 adversarial review (9 challenges, PROCEED 0.84, 2 revisions)
---ci---
project: acdl
phase: 0
milestone: v1.26
status: grill
verdict: PROCEED
confidence: 0.84
revisions: [G-Q4 REQ-322 to P2 W0, G-Q6 enforcement-deferred note, G-Q9 key-split future item]
---/ci---
2026-08-12 21:20:11 +00:00
Jon Chery 36c8ae9a80 docs(P00): grill — PROCEED (0.86), 0 escalations, 2 revisions
10 challenges red-teamed across feasibility, scope, budget, swap boundary.
8 PROCEED (deterministic-not-AI, swap boundary is the moat, MTTR <1s,
policy count manageable, tagging cross-check worth it, PCR list is valid
payload, phase count matches cadence, severity annotation K8s-standard).
2 REVISE (NullEngine vs kj-not-configured distinct ruleIds; protocol
conformance test via NullEngine). All revisions are PLAN/REQ clarifications
— no requirement changes.

---ci---
project: acdl
phase: 0
milestone: v1.25
status: grill
---/ci---
2026-08-12 18:12:05 +00:00
Jon Chery 0920550ae5 docs(P00): grill — PROCEED (0.82), 0 escalations, 2 revisions (already captured)
acdl-ci / Lint (push) Successful in 9s
acdl-ci / Test (push) Failing after 22s
acdl-ci / Platform check-only (offline) (push) Successful in 24s
Nova Slides Render / render (push) Failing after 22s
---ci---
project: acdl
phase: 0
milestone: v1.24
status: grill
---/ci---
2026-08-12 14:23:55 +00:00
Jon Chery ea44fdb9d6 docs(P00): grill v1.23 — PROCEED-WITH-REVISIONS (4 binding revisions)
Adversarial red-team review of the v1.23 Nova Deck Cleanup & Python PPTX
plan (7 phases, 5 waves). Overall verdict: PROCEED-WITH-REVISIONS (conf 0.78).

Empirically verified (P0 risks cleared):
- Image format: rendered HTML uses plain <img src="assets/png/...">, no
  xlink:href → inline_images.py regex will match (Axis 4 PASS, conf 0.95)
- Marp <div> passthrough: minimal test deck through marp-cli@4.5.0 confirms
  <div class="benefit"> passes through verbatim (Axis 6 PASS, conf 0.95)
- Versioning: no v1.22.* tags exist (Axis 10 PASS, conf 0.95)
- Test inversion list complete (Axis 3 PASS, conf 0.92)

4 binding revisions:
- G-001: Purge "penetrate" from entire repo (docs/ + .ciagent/), not just
  docs/presentations/ — term appears in docs/scope.md:16, docs/vision.md:18,
  and all .ciagent/*.md
- G-002: Serialize P3→P4 — "zero file overlap" is false for verification
  (P3 parser depends on deck P4 trims; P4 verify render depends on P3's
  render_slides.sh being stable)
- G-003: Split P3 into P3a (inline_images + render_slides.sh + pyproject —
  low-risk) and P3b (render_pptx.py + parser — high-risk, 10+ markdown
  constructs + python-pptx XML constraints)
- G-004: Merge P5+P6 — P6 is ceremonial overhead for an NFR docs milestone;
  P5 absorbs review/audit/ship. Net phases: 7 (P1, P2, P3a, P3b, P4, P5+P6)

No escalations (all axes resolved at conf >= 0.78).

---ci---
status: grill
decisions:
  - G-001: Purge "penetrate" from docs/ + .ciagent/ (conf 0.85)
  - G-002: Serialize P3->P4 (conf 0.85)
  - G-003: Split P3 into P3a + P3b (conf 0.80)
  - G-004: Merge P5+P6 (conf 0.80)
escalations: []
2026-08-12 00:02:57 +00:00
Jon Chery 7535c8ceb0 docs(grill): v1.17 red-team — 12 BIND, 2 ESCALATE, REDUCE-SCOPE verdict
NORTH_STAR alignment (Axis 1):
- G-Q1 BIND: AI-Agent Intent Share is an orphan target — NORTH_STAR:128
  claims a placeholder view that PLAN P3 does not build (8 views listed,
  none for it). No REQ-185..213 backs it. Violates "no fabrication."
- G-Q4 BIND: slide 7 cites D-122 but never tells the audience the "AI"
  is a confidence-gated policy engine, not an LLM. Honesty buried in a
  linked doc.
- G-Q5 BIND: derived metrics (FTE, ROI) computed on 0 production runs
  shown on slide 12 without the zero-denominator caveat.
- G-Q6 BIND: NORTH_STAR:111 ("committed, not aspirational") contradicts
  PO's "simply to target" + 0 consumers (PROJECT.md:495). 3 "grounded"
  targets have non-existent scope (production estates). Reclassify to
  partial (Cloud Spend precedent). NORTH_STAR-CHANGE trailer required.

Deck story & arc (Axis 2):
- G-Q8 BIND(minor): slide 1 preview is a table of contents, not a hook.
- G-Q9 BIND: 4 of 17 benefit callouts are filler (slides 1, 4, 12, 15).
- G-Q10 BIND(minor): slide 12 crams 6 metrics — split into two.
- G-Q11 BIND: slide 13 (deferred) invites the "can't prove ops healthy"
  objection — add preempt.

Deck per-slide rigor (Axis 3):
- G-Q13 BIND: 3 of 13 transitions hand-waved (esp. Act 3→4 boundary 8→9).
- G-Q14 BIND: slide 9 (Telemetry Architecture) is the audience-loss slide.
- G-Q15 BIND(minor): slide 12 derived metrics lack formula + N=0 caveat.
- G-Q16 BIND: slide 15 ask is insider language, not a business decision.

PASS: G-Q2 (anti-goals, conditional on slide 3), G-Q3 (attestation
consistency — excellent), G-Q7 (arc order — marginal), G-Q12 (slide
openings — formulaic but substantive).

ESCALATE: E-003 (reclassify 3 targets to partial vs redefine "grounded"),
E-004 (AI-Agent Intent Share: 12–18mo target vs Future Horizons).

Verdict: REDUCE SCOPE / BINDING FIXES REQUIRED. 12 fixes, no re-architect;
1–2 phases of rework in P0 (NORTH_STAR) + P5 (deck). Critical path
unchanged. Confidence 0.80.

---ci---
status: grill
verdict: reduce-scope
binding_decisions:
  - G-Q1: BIND (0.90) — add 9th placeholder view OR move AI-Agent Intent
    Share to Future Horizons; correct NORTH_STAR:128
  - G-Q4: BIND (0.85) — add D-122 honesty sentence to slide 7 Delivers
  - G-Q5: BIND (0.82) — annotate derived metrics on slide 12 with
    zero-run caveat
  - G-Q6: BIND (0.80) — rewrite NORTH_STAR:111; reclassify 3 targets to
    partial; regroup deck slide 5; NORTH_STAR-CHANGE trailer
  - G-Q8: BIND (0.70) — add stake line with real number to slide 1
  - G-Q9: BIND (0.78) — rewrite 4 filler closes (slides 1,4,12,15)
  - G-Q10: BIND (0.68) — split slide 12 into two; deck -> 18 slides
  - G-Q11: BIND (0.75) — add preempt to slide 13
  - G-Q13: BIND (0.85) — rewrite 3 hand-waved transitions (8->9 critical)
  - G-Q14: BIND (0.78) — compress slide 9 or reframe its Benefit to trust
  - G-Q15: BIND (0.80) — show ROI formula + N=0 caveat on slide 12
  - G-Q16: BIND (0.82) — reframe slide 15 ask as business decision
escalations:
  - E-003: reclassify 3 "grounded" targets to partial vs redefine
    "grounded" — PO decision on NORTH_STAR target framing (<0.60)
  - E-004: AI-Agent Intent Share as 12–18mo target vs Future Horizons —
    PO strategic-scope decision (<0.60)
2026-08-04 19:37:24 +00:00
Jon Chery f83b974c0e Merge milestone/v1.16-nova-simplification — v1.16 complete (Nova Simplification: 20-phase NFR sweep + final; tag v1.15.26)
acdl-ci / Lint (push) Successful in 11s
acdl-ci / Platform check-only (offline) (push) Successful in 29s
acdl-ci / Test (push) Failing after 7m25s
2026-08-01 13:37:18 +00:00
Jon Chery 69ba3d728f verify(grill): v1.15-Nova rebrand — 9 axes, 8 findings (G-103..G-110), 3 binding mitigations
---ci---
status: grill
milestone: v1.15
verdict: proceed-with-conditions
confidence: 0.82
binding_decisions:
  - G-103: ACCEPT-AS-IS (feasibility) — 4-phase structure sound; conf 0.85
  - G-104: MITIGATE-BINDING (scope/technical) — re-tag as v1.15.x minor-bumped; conf 0.90
  - G-105: ACCEPT-AS-IS (cost) — no live apply during P0-P4; conf 0.80
  - G-106: MITIGATE-BINDING (risk/technical) — dual-read in BOTH .env.secrets load paths (run_platform.sh + regression_verify.py); conf 0.88
  - G-107: ACCEPT-AS-IS (testability) — per-phase fixture updates keep gate 16/16; mmdc via npx available; conf 0.82
  - G-108: MITIGATE-BINDING (security) — update CI workflow secrets: refs when NOVA_* Gitea secrets created; hard gate + retry; conf 0.80
  - G-109: ACCEPT-AS-IS (maintainability) — P5 mechanical cleanup; conf 0.78
  - G-110: ACCEPT-AS-IS (adversarial) — runbook + staged ordering is rollback; conf 0.75
escalations: []
open_issues:
  - G-104 mitigation must be incorporated into PLAN.md before P0 ship (re-tag v1.14.x -> v1.15.x)
  - G-106 mitigation must be incorporated into PLAN.md P2 (dual-read in run_platform.sh:288-289 + regression_verify.py:309-312)
  - G-108 mitigation must be incorporated into PLAN.md P2 task 3 (update .gitea/.github workflow secrets: refs)
---ci---
2026-07-30 00:39:01 +00:00
Jon Chery 3b1181f39b Merge milestone/v1.14-refinement — v1.14 complete (NFR Refinement: bug fixes, security, stubs, tests, docs; 20 phases + final; tag v1.13.24)
acdl-ci / Lint (push) Successful in 10s
acdl-ci / Platform check-only (offline) (push) Successful in 25s
acdl-ci / Test (push) Successful in 6m34s
v1.14 NFR Refinement milestone complete. 20 execution phases (P1-P20) +
1 final (P21). All P1/P2 backlog from v1.11 review resolved. Security
posture hardened (swallowed errors, account ID externalized, IAM scoped,
schema validation, credential hygiene). Stubs resolved (kyverno --kube-
version removed). 7 untested scripts gained coverage. Documentation
synced (ARCHITECTURE v1.11-v1.14 addenda, stale @v1.6-1.9 -> @v1.13,
GRILL G-005/G-008 resolved, COST.md window extended, D-083 deferral
recorded). Platform VPC parameterized.

561 tests pass (was 528 at v1.13.2; +33). 22/22 capabilities Verified.
6 grill binding decisions (G-101..G-106) applied. 1 escalation (E-001)
auto-resolved at full autonomy (D-101).

---ci---
project: acdl
phase: 21
milestone: v1.14
status: complete
---/ci---
2026-07-29 21:36:37 +00:00
Jon Chery 29eae2120d verify(grill): code review — 0 P0, 1 P1 auto-fixed, 0 P1+ flagged
acdl-ci / Lint (push) Successful in 8s
acdl-ci / Test (push) Successful in 2m7s
acdl-ci / Platform check-only (offline) (push) Successful in 9s
Multi-persona review of the grill deliverable (2 commits, 2 docs files).

P1-1 (auto-fixed): two mis-citations in GRILL.md cited
PROJECT.md:6 for the "0 consumer adoption" quote, but line 6 reads
"deployment through an agentic stack..." — the quote is at
PROJECT.md:487. Fixed both instances (Axis 1 Q3 + Axis 9 Q1).

Persona review:
- Correctness: 12 binding decisions traceable to evidence; 2 escalations
  correctly unresolved. All file:line citations now validate against
  source files. PASS (after P1 fix).
- Testing: docs-only; 513 fast tests pass (no regression). PASS.
- Security: no credential leakage; no sensitive data in report. PASS.
- Performance: N/A (docs file; no runtime cost). PASS.
- Maintainability: report follows grill workflow Step 5 format; appendable
  for future runs. PASS.
- Adversarial: AWS account 581513795199 + CAPABILITY_INVENTORY section
  references validated against source. Escalations surfaced, not skipped.
  PASS.

Verified after fix: all citations valid.

---ci---
project: acdl
phase: 0
milestone: v1.10
status: verify
lessons:
  - P1 fix: GRILL.md cited PROJECT.md:6 for "0 consumer adoption" but the
    quote is at PROJECT.md:487. Evidence citations must be validated
    against source line numbers, not just the file.
---/ci---
2026-07-27 19:33:24 +00:00
Jon Chery ac11c01247 docs(grill): adversarial review — 12 challenges, 10 binding decisions, 2 escalations
First grill run. Verdict: Proceed with conditions (confidence 0.72).
All 9 axes + meta reviewed; 10 binding decisions, 2 escalations.

Key reclassification: ACDL is an OSS reference implementation (G-003),
not a sponsored product. The grill's sponsor/ROI/budget/timeline axes
apply in weakened form; adoption, architecture, and risks apply in full.

Escalations (must resolve before leadership pitch):
- G-005 (risks): 6 cloud capabilities (CAP-017..022) deploy-unverified;
  re-bootstrap IAM or mark deploy-unverified in decks.
- G-008 (budget): no cost documentation despite live AWS resources;
  add COST.md or document zero-cloud-cost operating model.

---ci---
project: acdl
phase: 0
milestone: v1.10
status: grill
decisions:
  - id: G-001
    decision: Feature-complete MVP for leadership pitch + pilot consumers in parallel; CIAgent builds, Platform Team deploys.
    rationale: PROJECT.md admits 0 consumer adoption across 10 milestones; user clarified the pitch is the sponsor-acquisition moment and pilot consumers run in parallel.
    confidence: 0.65
    alternatives: [treat as pre-product and pause, dogfood via CI, add v1.11 adoption milestone]
  - id: G-002
    decision: ACDL is white-label; Platform Team customization is out-of-repo.
    rationale: User clarified the repo must stay generic for any platform team at any company; ops-handoff concern is intentionally out of scope.
    confidence: 0.78
    alternatives: [Platform Team joins post-pitch, CIAgent is ops team for MVP]
  - id: G-003
    decision: Reframe as OSS reference implementation; no sponsor/ROI required.
    rationale: White-label framing (G-002) makes ACDL a product with no signed pilot; user chose OSS reference framing where the bar is credible reference, not paying customer.
    confidence: 0.85
    alternatives: [escalate for named sponsor, treat senior leadership as sponsor]
  - id: G-004
    decision: Keep production-deployment vision; reference describes target state.
    rationale: PROJECT.md North Star describes the state a downstream team would achieve, not ACDL-the-repo's own production state; no rewrite needed.
    confidence: 0.75
    alternatives: [rewrite vision to OSS framing, escalate positioning instability]
  - id: G-005
    decision: ESCALATION — re-bootstrap IAM or mark CAP-017..022 deploy-unverified in decks.
    rationale: 6 of 22 advertised capabilities (27%) are unverifiable; terraform plan path is hope over evidence; no admin principal engaged; no pre-mortem.
    confidence: 0.80
    alternatives: [accept design-verified+locally-emulated as the bar, disclosure is sufficient]
  - id: G-006
    decision: Autonomous OSS build has no deadline; cadence acceptable.
    rationale: 10 milestones in 6 days with no deadline, critical path, or estimate basis; user accepts this for an autonomous OSS reference build.
    confidence: 0.72
    alternatives: [disclose no-deadline basis in PROJECT.md, impose dwell time / external review]
  - id: G-007
    decision: Milestone-level regression gate is correct; system worked as designed.
    rationale: D-091 regression gate caught the 8-phase decay at the milestone boundary; per-phase regression is accepted as unnecessary cost.
    confidence: 0.70
    alternatives: [extend regression gate to per-phase, treat decay as one-time event]
  - id: G-008
    decision: ESCALATION — add COST.md or document zero-cloud-cost operating model.
    rationale: No cost documentation exists despite live AWS resources (account 581513795199); financial-control gap.
    confidence: 0.74
    alternatives: [near-zero cloud cost; no doc needed, budget is downstream-team concern]
  - id: G-009
    decision: Autonomous CI is the governance; no human stop-trigger needed.
    rationale: config.json defines autonomy level, escalation hooks, confidence thresholds; user accepts this as the governance mechanism despite v1.10 decay incident.
    confidence: 0.68
    alternatives: [add documented stop-trigger to PROJECT.md, user is the stop-trigger]
  - id: G-010
    decision: OSS scope is contributor-bounded; no out-of-scope table needed.
    rationale: User accepts that an OSS reference implementation's scope is bounded by contributors, not by a formal out-of-scope table; v1.9.x deck-polish expansion accepted.
    confidence: 0.65
    alternatives: [add current Out-of-Scope section to PROJECT.md, Domain Boundaries is sufficient]
  - id: G-011
    decision: Single-maintainer is normal for OSS reference; no action.
    rationale: Bus factor is 1 (the user); user accepts this as normal for an OSS reference implementation; downstream forks improve the bus factor.
    confidence: 0.70
    alternatives: [document single-maintainer bus-factor-1 in PROJECT.md, pin agent/model version]
  - id: G-012
    decision: Full catalog is the value; no minimal release needed.
    rationale: User accepts the full 115-requirement build as the reference value; trimming to v1.2-equivalent would reduce the reference value for downstream teams.
    confidence: 0.68
    alternatives: [tag minimal-reference release (v1.2-equivalent), decks are the 80%-value artifact]
escalations:
  - G-005: 6 cloud capabilities (CAP-017..022) deploy-unverified; re-bootstrap IAM with admin principal or explicitly mark deploy-unverified in every leadership deck before the pitch.
  - G-008: no cost documentation despite live AWS resources; add COST.md or document zero-cloud-cost operating model.
---/ci---
2026-07-27 19:20:37 +00:00