Jon Chery
|
ed5ea90654
|
feat(P3): add 12-month product roadmap slides (REQ-244)
Slide 20 — 12-Month Product Roadmap: 4-quarter arc (Pilot Activation →
Provable Trust → Compounding ROI → Agentic Substrate).
Slide 21 — Quarter-by-Quarter Outcomes: detail table (theme, deliverable,
target metric, strategic-objective grounding).
Both grounded in NORTH_STAR's 4 strategic objectives + deferred-metric
candidate milestones. Distinct from Slide 15's deferred-metric unblock paths.
Matching talking-points sections added. HTML + PPTX re-rendered via S&P theme.
---ci---
project: acdl
phase: 3
milestone: v1.20
status: execute
requirements: [REQ-244]
---/ci---
|
2026-08-07 18:28:01 +00:00 |
|
Jon Chery
|
eb43e08367
|
docs(P5): deck rebuild — unified narrative deck (18 slides, x3 arc, per-slide benefits) + retire old decks (D-130)
P5 (Wave 3, docs) — REQ-196, 197, 202, 203, 213
New deck (unified narrative):
- docs/presentations/nova-no-humans-platform.md — source of truth (18 slides)
- docs/presentations/nova-no-humans-platform-marp.md — Marp deck
- docs/presentations/nova-no-humans-platform-talking-points.md — presenter cues
5-act arc: Problem -> Vision -> How -> Proof -> Roadmap
x3 structure at deck level (slide 1 = arc preview, slides 2-15 = tell them, slide 16 = recap + ask)
x3 per slide (opens with what it covers, delivers, closes with benefit callout)
Fluid transitions (every slide references the previous slide's close)
Act indicator in Marp footer
Grill binding decisions applied:
- G-Q4: D-122 honesty sentence on slide 7
- G-Q8: stake line (18V+0 consumers) on slide 1
- G-Q9: 4 filler benefit closes rewritten
- G-Q10: slide 12 split into Zero-Touch Efficiency + Cost & ROI
- G-Q11: preempt on slide 14 (deferrals are measurement infra, not autonomy)
- G-Q13: Act 3->4 transition rewritten
- G-Q14: slide 9 benefit reframed to trust substrate
- G-Q15: ROI formula inline + N=0 caveat on slide 13
- G-Q16: slide 16 ask reframed as business decision
Retired (D-130):
- how-the-platform-works.md + marp + html + talking-points (DELETED)
- the-developer-experience.md + marp + html + talking-points (DELETED)
---ci---
project: acdl
phase: 5
milestone: v1.17
status: execute
---/ci---
|
2026-08-04 20:06:47 +00:00 |
|