Commit Graph

5 Commits

Author SHA1 Message Date
CIAgent Orchestrator c19cc68d15 docs(P02): complete gitea-scrub-decisions phase (REQ-367, REQ-368, v1.28.2)
Nova Slides Render / render (push) Failing after 14m19s
---ci---
project: acdl
phase: 2
milestone: v1.29
status: complete
---/ci---
2026-08-20 05:16:53 +00:00
Jon Chery 358aa62c3a fix(P2): render scripts — delete render_deck.sh, pin versions, 2x scale (REQ-257,258)
REQ-257: deleted scripts/render_deck.sh (omitted --theme, produced
unthemed output; README already documents render_slides.sh as
canonical). Pinned marp-cli@4.5.0 + mermaid-cli@11.16.0 in
render_slides.sh to prevent boilerplate-CSS drift. Removed
render_deck.sh references from README, sync_to_nova.sh, and
test_no_forge_mentions.py.
REQ-258: added -s 2 -b transparent to mermaid-cli invocation (matches
README spec line 193). Produces crisp 2x PNGs with transparent
backgrounds instead of 1x renders.

---ci---
project: acdl
phase: 2
milestone: v1.22
status: execute
phase_role: execution
---/ci---
2026-08-11 19:38:27 +00:00
Jon Chery 2273009b95 feat(P2): dedicated S&P theme + render pipeline + CI workflow (REQ-239..243)
Create nova-sp-theme.css — S&P Global Energy Marp theme (Red/Black/White
palette applied to all slide chrome: backgrounds, headers/footers, pagination,
tables, blockquotes, code blocks).
Create render_slides.sh — end-to-end pipeline: mermaid PNGs + Marp HTML/PPTX.
Create slides.yml CI workflow — auto-renders on docs/presentations/ changes.
Create test_slides_pipeline.py — 12 tests (theme CSS, Marp frontmatter, script,
workflow, .mmd/.png parity, README retired-deck cleanup).
Update Marp frontmatter: theme: nova-sp + footer v1.20.
Fix presentations/README.md directory layout (remove retired decks).
Re-render HTML + PPTX with S&P theme.

---ci---
project: acdl
phase: 2
milestone: v1.20
status: execute
requirements: [REQ-239, REQ-240, REQ-241, REQ-242, REQ-243]
---/ci---
2026-08-07 18:26:51 +00:00
Jon Chery 0b79b16715 fix(P2): add metrics domain to sync_to_nova.sh — consumer export views (REQ-229)
acdl-ci / Lint (push) Successful in 9s
acdl-ci / Test (push) Failing after 22s
acdl-ci / Platform check-only (offline) (push) Successful in 23s
The metrics/ export views (README.md, TRUST_SNAPSHOT.md, powerbi/) are
consumer-facing but fell outside the original 13 domains, so the first nova
release left them untracked. Adds a 14th domain 'metrics' between docs and
workflows. Updates TestSyncToNovaScript domain-order assertion to 14.

---ci---
project: acdl
phase: 2
milestone: v1.19
status: complete
phase_role: final
---/ci---
2026-08-06 15:47:25 +00:00
Jon Chery a4c5f332f6 feat(P1): sync_to_nova.sh — manual-only 2nd-release pipeline into ~/nova (REQ-229)
Replaces scripts/sync_to_gl.sh (kitchen-sink mirror sync into ~/gl/acdl) with
scripts/sync_to_nova.sh — a manual-only, consumer-subset, domain-committed
2nd-release pipeline into ~/nova (GitLab jonathanchery/nova, separate repo +
history, consumer/platform-team audience).

- Manual-only gate: refuses without --release / RELEASE_CONFIRMED=1 (exit 2).
  Never triggerable by CI.
- Consumer subset: excludes .ciagent/, .gitea/, .env*, terraform/, demo/,
  runtime metrics artifacts, and 18 internal-only scripts (EXCLUDE_SCRIPTS).
  Keeps consumer runbooks + metrics export views (README, powerbi,
  TRUST_SNAPSHOT). Protects ~/nova/.git via rsync --filter=P .git.
- Domain-based commits: 13 fixed-order domains (config, core, adapters,
  modules, contracts, schemas, pipelines, mcp, skills, scripts, tests, docs,
  workflows). Each changed domain gets its own conventional commit supplied
  positionally via repeated -m flags. No kitchen-sink commit.
- Conventional-commit validation: regex-enforced (feat|fix|docs|chore|...);
  bypass via --no-verify-format.
- Modes: --list-domains, --dry-run, --no-push, -v, -h.
- Tests: TestSyncToNovaScript (8 tests) covers gate, domain order, exclude
  list, consumer-script inclusion, .git protection filter, conventional
  regex.

Decisions: D-143 (target ~/nova), D-144 (conventional commits per domain,
not ---ci--- audit blocks), D-145 (manual-only trigger), D-146 (13 fixed
domains, positional-over-changed mapping), D-147 (coreci/Atelier review
gate deferred).

---ci---
project: acdl
phase: 1
milestone: v1.19
status: execute
requirements:
  covered: [REQ-229]
  partial: []
---/ci---
2026-08-06 15:40:11 +00:00