docs(milestone): complete v1.28 CLI Canonicalization + Identity Layer (release v1.27.6)
Nova Slides Render / render (push) Failing after 29s

---ci---
project: acdl
phase: 6
milestone: v1.28
status: complete
requirements:
  covered: [REQ-323..353]
  partial: []
---/ci---
This commit is contained in:
Jon Chery
2026-08-19 23:47:44 +00:00
parent 0d8913a299
commit adc55a17ab
5 changed files with 132 additions and 41 deletions
+25 -8
View File
@@ -1,18 +1,35 @@
{
"phase": 5,
"phase": 6,
"stage": "complete",
"milestone": "v1.28",
"phase_role": "execution",
"phase_role": "final",
"attempts": 0,
"updated_at": "2026-08-19T23:45:00Z",
"updated_at": "2026-08-19T23:59:00Z",
"project": "acdl",
"projects": ["acdl", "nova-blockchain-exchange"],
"active_milestone": "v1.28",
"milestone_branch": "milestone/v1.28-cli-identity",
"phase_branch": "phase/05-docs-integration",
"phase_branch": "phase/06-final-review-ship",
"tag_line": "v1.27.x",
"phase_name": "docs-integration",
"reqs_covered": ["REQ-345", "REQ-346", "REQ-347", "REQ-348", "REQ-349", "REQ-350", "REQ-351"],
"tests": {"p5_specific": 17, "total_passing": 1000, "failures": 0},
"notes": "v1.28 P5 SHIP. docs-integration complete. Tag v1.27.5. 7 REQs covered (REQ-345..351). Operator guide (C-6.3), developer guide (C-7.3), threat model (C-6.2, C-9.2 INV audit), E2E test (REQ-348). 1000 tests passing. Next: P6 final-review-ship (milestone release)."
"phase_name": "final-review-ship",
"reqs_covered": ["REQ-323..353"],
"reqs_partial": [],
"caps_verified": ["CAP-033", "CAP-034", "CAP-035", "CAP-036", "CAP-037", "CAP-038"],
"invariants_added": ["INV-12", "INV-13", "INV-14", "INV-15", "INV-16", "INV-17"],
"decisions": ["D-226", "D-227", "D-228", "D-229", "D-230", "D-231"],
"milestone_complete": true,
"milestone_release": {"tag": "v1.27.6", "type": "feature"},
"tests": {"total_passing": 1000, "failures": 0, "deselected": 5},
"phases": [
{"phase": 0, "tag": "v1.27.0", "status": "complete"},
{"phase": 1, "tag": "v1.27.1", "status": "complete"},
{"phase": 2, "tag": "v1.27.2", "status": "complete"},
{"phase": 3, "tag": "v1.27.3", "status": "complete"},
{"phase": 4, "tag": "v1.27.4", "status": "complete"},
{"phase": 5, "tag": "v1.27.5", "status": "complete"},
{"phase": 6, "tag": "v1.27.6", "status": "complete"}
],
"grill": {"verdict": "PROCEED-WITH-CONDITIONS", "confidence": 0.76, "critical_resolved": 3, "tracked_resolved": 16},
"audit": {"reconstruction": "PASS", "commit_discipline": "CLEAN", "branch_hygiene": "CLEAN", "file_discipline": "CLEAN"},
"notes": "v1.28 COMPLETE. Feature milestone (CLI Canonicalization + Identity Layer). 7 phases (P0 + P1..P5 execution + P6 final). 31 REQs covered (REQ-323..353). 6 CAPs verified (CAP-033..038). 6 invariants added (INV-12..17). 6 decisions (D-226..231). Grill PROCEED 0.76 (3 critical + 16 tracked conditions resolved). 1000 tests passing, 0 failures. Audit: reconstruction PASS, commit/branch/file discipline CLEAN. Merged milestone/v1.28-cli-identity -> main. Tag v1.27.6 = milestone release. All milestone branches deleted."
}