decision(P00): mvp/ux gate — auto-generated (3 sections verified, PASS)
---ci--- project: acdl phase: 0 milestone: v1.28 status: mvp_ux_check ---/ci---
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
{
|
||||
"phase": 0,
|
||||
"stage": "grill",
|
||||
"stage": "mvp_ux_check",
|
||||
"milestone": "v1.28",
|
||||
"phase_role": "pre_execution",
|
||||
"attempts": 0,
|
||||
@@ -24,5 +24,5 @@
|
||||
{"phase": 6, "name": "final-review-ship", "reqs": ["REQ-352..353"], "tag": "v1.27.6"}
|
||||
],
|
||||
"grill": {"verdict": "PROCEED-WITH-CONDITIONS", "confidence": 0.76, "critical_conditions": 3, "tracked_conditions": 16, "escalations": 0},
|
||||
"notes": "v1.28 GRILL complete. 9 axes reviewed; all PROCEED-WITH-CONDITIONS (>=0.70). 3 critical fixes applied (ABAC fail-closed C-6.1, JWS KDF C-5.2, traceability drift C-9.1) + 16 tracked conditions. P5 folded into P4 Wave 8 (C-2.1) -> 6 execution phases. Cost envelope ~$9/mo. Next: MVP/UX CHECK -> SHIP."
|
||||
"notes": "v1.28 MVP/UX CHECK passed (auto, full autonomy). 3 PLAN.md sections verified: User-Facing Surface (nova --help/init/auth login/apply --local/idp setup + developer-guide + test_e2e_idp), Happy Path (J2 Dev authenticates + deploys locally, written BEFORE execute), UX Acceptance Criteria (7 criteria). Gate PASS. Next: SHIP phase 0."
|
||||
}
|
||||
Reference in New Issue
Block a user