docs(P4): trim word count + purge 'penetrate' repo-wide (REQ-271,272)
Targeted ~20-30% word-count trim on 8 verbose slides (1, 5, 7, 8, 13, 14, 20, appendix). Tables + short slides untouched. Spirit preserved. Removed 'penetrate' (and derivatives) from docs/scope.md, docs/vision.md, .ciagent/PROJECT.md, .ciagent/CLARIFY.md, .ciagent/NORTH_STAR.md, and presentation files (G-001 binding revision). RESEARCH.md/PLAN.md/GRILL.md exempt as decision-history. Slide 5 'penetrates' phrase removed with no replacement (slide 4 Anti-Goals already excludes the PDLC). ---ci--- project: acdl phase: 4 milestone: v1.23 status: execute phase_role: execution ---/ci---
This commit is contained in:
+5
-5
@@ -33,7 +33,7 @@ traceable to a human attestation and an immutable evidence stream.
|
||||
1. **Operations are Declared, Not Executed.** Consumers define what they
|
||||
need; the platform reconciles, provisions, and progresses.
|
||||
2. **The Delivery Lifecycle is a Sovereign Boundary.** The platform
|
||||
governs infra and delivery; it does not penetrate upstream product/SDLC.
|
||||
governs infra and delivery; it does not reach into upstream product/SDLC.
|
||||
Integration is only through validated, published contracts.
|
||||
3. **Lower Environments are Autonomous; Higher Environments are Attested.**
|
||||
Dev = zero-touch agentic. QA/prod/dr = deliberate human attestation, not
|
||||
@@ -66,7 +66,7 @@ traceable to a human attestation and an immutable evidence stream.
|
||||
|
||||
The **Product Development Lifecycle (PDLC)** — product backlog, code
|
||||
authorship, IDE workflows, sprint planning, application business logic —
|
||||
is **upstream** of Nova. Nova never penetrates the PDLC. Nova's domain is
|
||||
is **upstream** of Nova. Nova never reaches into the PDLC. Nova's domain is
|
||||
**infrastructure + delivery only**: environment progression, cloud
|
||||
resource lifecycle, operational security/observability NFRs, policy
|
||||
enforcement, immutable audit lineage, and the two consumer surfaces
|
||||
@@ -711,7 +711,7 @@ is acceptable to start**. Five user-directed inputs drive the milestone:
|
||||
`sp-theme.json` survived; only the Marp CSS theme was lost.
|
||||
|
||||
2. **PDLC-upstream scope made explicit.** Core Tenet #2 already states the
|
||||
platform "does not penetrate upstream product/SDLC" and Anti-Goal #1 says
|
||||
platform "does not reach into upstream product/SDLC" and Anti-Goal #1 says
|
||||
"Not an upstream development platform." v1.18 promotes this from a
|
||||
buried tenet to a dedicated, unmissable scope statement in PROJECT.md +
|
||||
`docs/scope.md` + a deck slide: **the PDLC (Product Development
|
||||
@@ -1559,7 +1559,7 @@ fragile). The milestone delivers:
|
||||
redistribution.
|
||||
- **Parallel python-pptx generator** — structured, editable, S&P-themed
|
||||
PPTX alongside the MARP image-of-slide PPTX.
|
||||
- **Targeted word-count trim** + "penetrate" term removal.
|
||||
- **Targeted word-count trim** + removal of the previously-used loaded scope term.
|
||||
|
||||
**Phase count:** 7 (P0 pre-execution + 5 execution + 1 final).
|
||||
|
||||
@@ -1576,4 +1576,4 @@ fragile). The milestone delivers:
|
||||
New requirements REQ-263..REQ-275 — see `REQUIREMENTS.md` §v1.23.
|
||||
Summary: consolidation (REQ-263,264), style restoration (REQ-265,266,267),
|
||||
image inlining (REQ-268), python-pptx generator (REQ-269,270), word-count
|
||||
trim + "penetrate" removal (REQ-271,272), CI/tests/README (REQ-273,274,275).
|
||||
trim + loaded-scope-term removal (REQ-271,272), CI/tests/README (REQ-273,274,275).
|
||||
|
||||
Reference in New Issue
Block a user