docs(milestone): complete v1.21 — Nova Deck Refinement & Pipeline Hardening
9 requirements complete (REQ-245..253): - P1: strategic-docs — thesis rename + NORTH_STAR objectives + RACI restructure (REQ-246,247) - P2: slides source-of-truth — rename + restructure + rewrite (REQ-245, 248,249,252) - P3: marp deck + talking points + README + theme CSS fix (REQ-251,252) - P4: pipeline hardening — Checkov before plan, Wiz-or-Checkov on plan (REQ-250) - P5: render + verify — new diagrams, HTML, PPTX, 686 tests pass (REQ-253) - P6: final review + ship (this commit) Deck renamed nova-no-humans-platform* -> nova-autonomous-cloud-delivery*. Title: 'Nova — The Autonomous Cloud Delivery Platform'. 4-beat arc (Problem -> Solution -> Proof -> Roadmap + Ask). 18 main + 1 appendix slides. All 33 review notes applied. Tags on v1.20.x line (v1.20.0 P0 -> v1.20.6 P6 final = milestone release). ---ci--- project: acdl phase: 6 milestone: v1.21 status: complete phase_role: final requirements: covered: [REQ-245,REQ-246,REQ-247,REQ-248,REQ-249,REQ-250,REQ-251,REQ-252,REQ-253] partial: [] ---/ci---
This commit is contained in:
@@ -1,11 +1,12 @@
|
||||
{
|
||||
"phase": 0,
|
||||
"stage": "plan",
|
||||
"phase": 6,
|
||||
"stage": "complete",
|
||||
"milestone": "v1.21",
|
||||
"phase_role": "pre_execution",
|
||||
"phase_role": "final",
|
||||
"attempts": 0,
|
||||
"updated_at": "2026-08-11T00:01:00Z",
|
||||
"milestone_complete": false,
|
||||
"updated_at": "2026-08-11T00:30:00Z",
|
||||
"milestone_complete": true,
|
||||
"tag": "v1.20.6",
|
||||
"requirements": ["REQ-245","REQ-246","REQ-247","REQ-248","REQ-249","REQ-250","REQ-251","REQ-252","REQ-253"],
|
||||
"notes": "v1.21 P0 plan stage complete. PLAN.md v1.21 section written. 5 execution phases (P1 strategic-docs, P2 slides, P3 marp+talking-points+README, P4 pipeline-hardening, P5 render+verify) + P6 final-review-ship. Wave 1 (P1/P2/P4 parallelizable), Wave 2 (P3), Wave 3 (P5), Wave 4 (P6). CLARIFY+RESEARCH minimal at full autonomy — domain known, requirements confirmed with user. Proceeding to P0 ship then execution."
|
||||
"notes": "v1.21 milestone complete. 9 requirements (REQ-245..253) across 6 execution phases + P0 pre-execution. P1 strategic-docs (thesis rename + NORTH_STAR objectives + RACI restructure); P2 slides source-of-truth (rename + restructure + rewrite, 18 main + 1 appendix); P3 marp deck + talking points + README + theme CSS fix; P4 pipeline hardening (Checkov before plan, Wiz-or-Checkov on plan, never both); P5 render + verify (new diagrams, HTML, PPTX, 686 tests pass + 1 pre-existing attestation env failure). Deck renamed nova-no-humans-platform* -> nova-autonomous-cloud-delivery*. Title: 'Nova — The Autonomous Cloud Delivery Platform'. 4-beat arc (Problem -> Solution -> Proof -> Roadmap + Ask). All 33 review notes applied. Tags on v1.20.x line (v1.20.0 P0 -> v1.20.6 P6 final). Next milestone starts fresh."
|
||||
}
|
||||
@@ -1707,12 +1707,12 @@ release; attach the PPTX.
|
||||
|
||||
| REQ | Phase | Status |
|
||||
|-----|-------|--------|
|
||||
| REQ-245 | P2 | pending |
|
||||
| REQ-246 | P1 | pending |
|
||||
| REQ-247 | P1 | pending |
|
||||
| REQ-248 | P2 | pending |
|
||||
| REQ-249 | P2 | pending |
|
||||
| REQ-250 | P4 | pending |
|
||||
| REQ-251 | P3 | pending |
|
||||
| REQ-252 | P2 | pending |
|
||||
| REQ-253 | P5 | pending |
|
||||
| REQ-245 | P2 | complete |
|
||||
| REQ-246 | P1 | complete |
|
||||
| REQ-247 | P1 | complete |
|
||||
| REQ-248 | P2 | complete |
|
||||
| REQ-249 | P2 | complete |
|
||||
| REQ-250 | P4 | complete |
|
||||
| REQ-251 | P3 | complete |
|
||||
| REQ-252 | P2 | complete |
|
||||
| REQ-253 | P5 | complete |
|
||||
|
||||
@@ -1892,3 +1892,80 @@ release). **DONE.**
|
||||
- Milestone branches merged to main.
|
||||
- Tag `v1.19.4` created; release notes summarize all 15 requirements.
|
||||
- CHECKPOINT cleared; milestone branches deleted.
|
||||
|
||||
## v1.21 — Nova Deck Refinement & Pipeline Hardening (complete)
|
||||
|
||||
> Leadership-deck refinement based on 33 review notes on the v1.20 deck.
|
||||
> Renamed the deck to the professional "Autonomous Cloud Delivery
|
||||
> Platform" framing; restructured the narrative (Problem → Solution →
|
||||
> Proof → Roadmap + Ask); removed internal provenance from
|
||||
> audience-facing slides; hardened the policy pipeline (Checkov before
|
||||
> plan, Wiz-or-Checkov on plan); moved the strategic integration
|
||||
> objective into the North Star.
|
||||
>
|
||||
> Tags run on the v1.20.x line (milestone v1.21 → tags v1.20.0..v1.20.6).
|
||||
> Flat workflow: commits on main, tags per phase.
|
||||
|
||||
### Phase P0 — pre-execution (complete, tag v1.20.0)
|
||||
- SPECIFY → CLARIFY → RESEARCH → PLAN. Validated v1.21 requirements
|
||||
(REQ-245..253). Established `active_milestone: "v1.21"`. Synced
|
||||
PROJECT.md strategic-direction pillar.
|
||||
|
||||
### Phase P1 — strategic-docs (complete, tag v1.20.1)
|
||||
- `git mv .ciagent/NO_HUMANS_THESIS.md .ciagent/AUTONOMY_THESIS.md` +
|
||||
reframe content (autonomy in operations, not "removing humans").
|
||||
- `NORTH_STAR.md`: vision polished ("invisible" → "visible"); obj #2
|
||||
deterministic-scoring reword; obj #3 four CTO metrics; obj #4 replaced
|
||||
with integration objective; drop anti-goals 1,4,5; add 2 new
|
||||
anti-goals; anti-goal #3 reworded.
|
||||
- `docs/raci.md`: 3 roles → 4 roles (add Quality Engineering; rename
|
||||
Release Mgmt → SRE; split release attestation).
|
||||
- `docs/scope.md` + render scripts + ONBOARDING: integration framing +
|
||||
"no-humans" → "autonomous".
|
||||
|
||||
### Phase P2 — slides source-of-truth (complete, tag v1.20.2)
|
||||
- `git mv` all 5 deck files `nova-no-humans-platform*` →
|
||||
`nova-autonomous-cloud-delivery*`.
|
||||
- Rewrote source of truth to 18 main + 1 appendix slides, 4-beat arc.
|
||||
All 33 review notes applied. Removed: old Slide 10 (Capability
|
||||
Health), old Slide 12 (Zero-Touch), Appendix A2 (Operating Model &
|
||||
Cost). Global: tech-leadership benefits; no D-###/REQ-###/.py paths in
|
||||
audience slides; no badges; no version in footer.
|
||||
|
||||
### Phase P3 — marp deck + talking points + README (complete, tag v1.20.3)
|
||||
- Synthesized Marp deck from updated source; frontmatter — title
|
||||
"Nova — The Autonomous Cloud Delivery Platform", footer without
|
||||
version + without "Act N/5", title-slide subtitle "Product Development
|
||||
& Citizen Developer Overview"; no badges.
|
||||
- Re-distilled talking points to 18-slide + A1 structure.
|
||||
- README updated (deck title, audience, slide count, directory layout,
|
||||
no badge docs).
|
||||
- Theme CSS: fixed Appendix A1 table readability (explicit white body
|
||||
on any background).
|
||||
- Tests: added v1.21 assertions (no badges, no version, 18+1 slides, no
|
||||
D-###/REQ-###/.py paths, old files removed, default deck renamed).
|
||||
|
||||
### Phase P4 — pipeline hardening (complete, tag v1.20.4)
|
||||
- Two-stage policy scan (REQ-250): Checkov on static code BEFORE plan
|
||||
(fail-fast); Wiz-or-Checkov on the plan AFTER plan (never both).
|
||||
Implemented in run_platform.sh + run_codegen.sh + run_postapply.sh.
|
||||
- `adapters/wiz/wiz_adapter.py`: added --plan mode CLI.
|
||||
- `pipelines/contract.yml`: 'checkov' stage replaced by 'checkov-static'
|
||||
(before terraform-plan) + 'runtime-policy-scan' (after). 9 → 10 stages.
|
||||
- Tests updated; full suite 686 pass + 1 pre-existing attestation
|
||||
failure (unrelated env issue).
|
||||
|
||||
### Phase P5 — render + verify (complete, tag v1.20.5)
|
||||
- New mermaid diagrams: platform-pipeline.mmd/.png (slide 6),
|
||||
telemetry-live-ops.mmd/.png (slide 9).
|
||||
- Re-rendered HTML + PPTX (20 slides, 21 media files).
|
||||
- Verify: 101 v1.21-specific tests pass; 686 full suite pass;
|
||||
check-only pipeline exit 0; no no-humans/D-###/REQ-###/badge in
|
||||
audience-facing deck files.
|
||||
|
||||
### Phase P6 — final-review-ship (Final Phase, complete, tag v1.20.6)
|
||||
- Multi-file audit: git log matches `.ciagent/` discipline; deck files
|
||||
renamed; forbidden content absent from audience-facing slides.
|
||||
- Ship: tag `v1.20.6` (final patch = milestone release). Requirements
|
||||
marked complete; ROADMAP marked complete; CHECKPOINT cleared.
|
||||
- **Requirements:** REQ-245..253 (9 requirements, all complete).
|
||||
|
||||