diff --git a/.ciagent/GRILL.md b/.ciagent/GRILL.md index 90ba90a..9e754c2 100644 --- a/.ciagent/GRILL.md +++ b/.ciagent/GRILL.md @@ -636,3 +636,262 @@ re-provision the bucket. YES, once G-111's criterion restatement + gate update are incorporated (into P9's must-haves). G-112/G-113 are phase-entry clarifications for P9/P12/P13. E-002 is deferred to P21. Confidence 0.85. + +--- + +# GRILL — v1.17 "Strategic Direction, Leadership Metrics & Unified Story" (2026-08-04) + +> **Griller:** CIAgent (red-team mode). **Milestone:** v1.17. **Axes:** 3 +> (NORTH_STAR alignment, Deck story & arc, Deck per-slide rigor) per PO +> direction. **Stance:** adversarial — presumed over-scoped / infeasible / +> storytelling-weak until evidence forced otherwise. + +## Evidence base + +- `NORTH_STAR.md` (183 lines, draft), `PLAN.md` (1,114 lines, deck rebuild + plan incl. slide-by-slide), `REQUIREMENTS.md` v1.17 (REQ-185..213), + `RESEARCH.md` v1.17 (signal inventory, scorecard, deferred-decision + ledger, deck research). +- Codebase cross-checks: `REGRESSION_REPORT.json` = **18 Verified + 4 + Skipped** (NOT "22/22 Verified" — the new deck plan correctly says + 18V+4S; the *existing* decks still claim 22/22). `PROJECT.md:495` = + **0 consumer adoption**. `docs/NO_HUMANS_THESIS.md`, `docs/METRICS.md`, + `metrics/` do not yet exist (P4/P5 deliverables — expected). +- Decisions locked (D-120..D-132) — not re-litigated. + +## The central contradiction + +**NORTH_STAR.md:111** states: *"Targets are committed, not aspirational."* +**PO's G-Q6 answer:** *"the goal is simply to target a high touchless +resolution rate, not to say we have reached those targets given there are +0 consumers."* + +These two statements are in direct conflict. "Committed, not aspirational" ++ "simply to target" = the document is lying about its own epistemic +status. This is the v1.10 decay root cause (PRE_MORTEM FM-3: decks +outrunning verified reality) repeating itself in the document meant to +prevent it. + +## Axis 1 — NORTH_STAR alignment + +### G-Q1 — Target with no backing REQ / placeholder +**Finding:** AI-Agent Intent Share (≥40%) is a committed 12–18mo target +(NORTH_STAR:128) with "placeholder view" claimed, but it is NOT among the +8 placeholder views in PLAN P3 (lines 309–315), and no REQ-185..213 builds +an emitter or placeholder for it. RESEARCH §3 marks it "future" with no +controlling decision ID (unlike every other deferred metric). NORTH_STAR:128 +falsely claims a placeholder view exists → violates the "no fabrication" +hard constraint. +**Verdict: BIND.** Add a 9th placeholder view OR move the target to a +"Future Horizons" section; correct NORTH_STAR:128. **Confidence: 0.90.** + +### G-Q2 — Anti-goal pursuit +**Finding:** No REQ builds an anti-goal. Deck title "No-Humans Infrastructure +Platform" is one weak slide away from violating anti-goal #3 (not removing +humans from accountability) — mitigation is entirely in slide 3's execution. +**Verdict: PASS (conditional on slide 3 landing the attestation model).** +**Confidence: 0.75.** + +### G-Q3 — Attestation clarification consistency +**Finding:** The attestation clarification is the most consistently +propagated concept in the plan — NORTH_STAR (3 places), REQUIREMENTS +(3 REQs), deck (3 slides). Well done. +**Verdict: PASS.** **Confidence: 0.92.** + +### G-Q4 — "AI decision" framing (D-122 honesty) +**Finding:** D-122 (confidence_signal + HITL gate, NOT an LLM) is cited on +slide 7 and required in NO_HUMANS_THESIS.md (REQ-213). BUT slide 7's +*Delivers* says "every AI decision captured" without ever telling the +audience what the "AI" is. The honesty is buried in a linked doc + a +decision ID the audience has never heard. +**Verdict: BIND.** Add one sentence to slide 7 *Delivers*: "Nova's 'AI +decision' is the confidence-gated policy engine, not an LLM planner +(D-122)." **Confidence: 0.85.** + +### G-Q5 — Secretly ungrounded metrics +**Finding:** The 8 deferred placeholder views cover their list. BUT (a) +AI-Agent Intent Share's placeholder is falsely claimed (G-Q1), and (b) +derived metrics (FTE Hours Saved, Platform ROI) are computed on zero +production runs yet shown on slide 12 without the zero-denominator caveat. +A "derived" metric from zero runs is technically not fabricated but is +misleading. +**Verdict: BIND.** (1) Resolve G-Q1; (2) slide 12 must annotate derived +metrics with "(computed on N internal runs; production-denominator activates +post-pilot)." **Confidence: 0.82.** + +### G-Q6 — 12–18mo target feasibility (0 consumers) +**Finding:** PO's answer ("simply to target") conflicts with NORTH_STAR:111 +("committed, not aspirational"). 3 "grounded (after P1)" targets (Touchless +Resolution, Human Escalation, AI Decision Accuracy) have scope "across +production estates" — but PROJECT.md:495 = 0 consumer adoption. The metric +IS computable on internal dev runs, but the target scope doesn't exist. +Marking "grounded" while the scope is absent is the overclaim the "no +fabrication" constraint exists to prevent. +**Verdict: BIND.** (1) Rewrite NORTH_STAR:111 → "Targets are committed +destinations; the grounding column records whether each is measurable this +milestone." (2) Reclassify the 3 targets to `partial — measurement pipeline +grounded on internal runs; production-estate scope activates post-pilot` +(the Cloud Spend Reduction precedent at NORTH_STAR:123). (3) Deck slide 5 +regroup as "Measurable today (internal runs)" vs "Activates post-pilot +(production estates)." Requires NORTH_STAR-CHANGE commit trailer (REQ-204). +**Confidence: 0.80.** + +## Axis 2 — Deck plan: story & arc + +### G-Q7 — Arc order (Problem→Vision→How→Proof→Roadmap vs Proof-first) +**Finding:** Current arc puts Proof at Act 4 (slides 10–13) — 40% of the +deck before a number. For a leadership audience that has seen 10+ milestone +decks, this risks losing the room by slide 4. BUT the "no-humans" thesis +is contentious; jumping to proof without the attestation model invites the +"removing humans from accountability" objection. The Vision act makes the +Proof credible. +**Verdict: PASS (marginal).** Defensible IF the Problem act is tight and +slide 3 front-loads the attestation clarification. **Confidence: 0.62.** + +### G-Q8 — x3 structure at deck level +**Finding:** Slide 1's 5-act preview is orienting (a table of contents), +not too much meta-structure. BUT it's also not a hook — it gives structure, +not stakes. A C-suite audience decides in the first 30 seconds. +**Verdict: BIND (minor).** Add one stake-establishing line to slide 1 +*Delivers* with a real number (18 verified, 0 consumers, honest deferral +list). **Confidence: 0.70.** + +### G-Q9 — Per-slide benefit callouts (substantive vs filler) +**Finding:** 4 of 17 closes are filler (slides 1, 4, 12, 15); 2 borderline +(8, A1). Worst offender: slide 12 (ROI) restates the *objective* ("ROI is +quantifiable") rather than giving the *number* or the *honest caveat*. +**Verdict: BIND.** Rewrite 4 filler closes. Slide 12's close must be: +"Benefit: you now know the ROI formula — (labor + cloud + avoided downtime) +÷ platform cost — and that it computes on internal runs today, with +production-denominator activating post-pilot." **Confidence: 0.78.** + +### G-Q10 — Deck length (17 slides) +**Finding:** 17 is at the upper bound but justifiable for 5 acts. The risk +is density, not length: slide 12 crams 6 metrics (Touchless, Human +Escalation, MTTR, Cost, FTE, ROI) into one slide — a wall of bullets. +**Verdict: BIND (minor).** Split slide 12 into "Zero-Touch Efficiency" +(Touchless, Human Escalation, MTTR) + "Cost & ROI" (Cost, FTE, ROI). Deck +→ 18 slides, each earning its place. **Confidence: 0.68.** + +### G-Q11 — "What's Deferred" slide (13) +**Finding:** The honesty strengthens the grounded claims BUT surfaces the +gap: Nova claims "no-humans in operations" while deferring the metrics +that would prove operations are healthy without humans (Live Infra Health, +SLA, Drift Auto-Reversal). A skeptical viewer notes the contradiction. +**Verdict: BIND.** Add preempt to slide 13: "These deferrals are about +*measurement infrastructure*, not about whether the platform runs without +humans — the platform runs autonomously today on internal runs; what's +deferred is the production-estate dashboard that would prove it at scale." +**Confidence: 0.75.** + +## Axis 3 — Deck plan: per-slide rigor + +### G-Q12 — Slide opening lines +**Finding:** The "This slide shows X" formula is orienting, not patronizing, +because each includes a stake-bearing clause. Consistent without being empty. +**Verdict: PASS.** **Confidence: 0.80.** + +### G-Q13 — Transitions (written vs hand-waved) +**Finding:** ~10 of 13 transitions are written (specific reference to prior +close). 3 are hand-waved (slides 8→9, 11→12, 13→14). Worst: the Act 3→4 +boundary (slide 8→9, How→Proof) — the most important transition in the deck +— is the weakest. +**Verdict: BIND.** Rewrite the 3 hand-waved transitions. The 8→9 Act +boundary must carry weight: "Having seen the gate model — autonomy in +operations, human in accountability — here is how Nova instruments itself +to prove that model at scale." **Confidence: 0.85.** + +### G-Q14 — Weakest slide (audience-loss point) +**Finding:** Slide 9 (Telemetry Architecture) is the audience-loss slide. +It's the 4th consecutive architecture slide (6,7,8,9), the most abstract +(CloudEvents, SQLite, PowerBI), its Benefit is about data plumbing not +business value, and it sits between the attestation matrix (slide 8, +emotionally resonant) and the Proof act (slide 10, the numbers) — between +the two things the audience came for. +**Verdict: BIND.** Compress slide 9 into slide 10 OR reframe its Benefit +from data plumbing to trust: "Benefit: you now know the proof you're about +to see isn't fabricated — every number traces to a file you can audit." +**Confidence: 0.78.** + +### G-Q15 — Proof act citation specificity +**Finding:** 5 of 6 Proof citations are specific (file paths + real numbers). +Gap: slide 12's derived metrics (FTE, ROI) cite "derived" without showing +the formula or the input count. +**Verdict: BIND (minor).** Show the ROI formula inline on slide 12 + the +N=0 production-runs caveat. **Confidence: 0.80.** + +### G-Q16 — Closing slide (15) — does the ask land? +**Finding:** THE ask is present but framed as insider language ("fund the +hot-path activation (post-D-096) + the tamper-evident ledger build-out +(D-083 lift)"). A leadership audience doesn't know what "hot-path +activation" means. The ask is a technical request, not a business decision +a leader can make in the room. +**Verdict: BIND.** Reframe slide 15's ask as a business decision: "The +ask: (1) approve a pilot estate to activate production-estate metrics +(unblocks D-096), and (2) approve the tamper-evident ledger build-out +(lifts D-083) — turning grounded claims into complete proof." Make it a +yes/no a leader can give. **Confidence: 0.82.** + +## Binding decisions (must resolve before SHIP) + +| G-ID | Axis | Verdict | What must change | Conf | +|---|---|---|---|---| +| G-Q1 | 1 | BIND | Add 9th placeholder view for AI-Agent Intent Share OR move to "Future Horizons"; correct NORTH_STAR:128 | 0.90 | +| G-Q4 | 1 | BIND | Add D-122 honesty sentence to slide 7 *Delivers* | 0.85 | +| G-Q5 | 1 | BIND | Annotate derived metrics on slide 12 with zero-run caveat | 0.82 | +| G-Q6 | 1 | BIND | Rewrite NORTH_STAR:111; reclassify 3 targets to `partial`; regroup deck slide 5. NORTH_STAR-CHANGE trailer required | 0.80 | +| G-Q8 | 2 | BIND (minor) | Add stake line with real number to slide 1 *Delivers* | 0.70 | +| G-Q9 | 2 | BIND | Rewrite 4 filler closes (slides 1, 4, 12, 15); slide 12 must give ROI formula + caveat | 0.78 | +| G-Q10 | 2 | BIND (minor) | Split slide 12 into two (Efficiency + Cost/ROI); deck → 18 slides | 0.68 | +| G-Q11 | 2 | BIND | Add preempt to slide 13 (deferrals are measurement infra, not whether platform runs without humans) | 0.75 | +| G-Q13 | 3 | BIND | Rewrite 3 hand-waved transitions (esp. Act 3→4 boundary 8→9) | 0.85 | +| G-Q14 | 3 | BIND | Compress slide 9 into slide 10 OR reframe its Benefit to trust | 0.78 | +| G-Q15 | 3 | BIND (minor) | Show ROI formula inline + N=0 caveat on slide 12 | 0.80 | +| G-Q16 | 3 | BIND | Reframe slide 15 ask as a business decision (pilot estate + ledger build-out) | 0.82 | + +**PASS (no change):** G-Q2 (anti-goals, conditional on slide 3), G-Q3 +(attestation consistency — excellent), G-Q7 (arc order — marginal), +G-Q12 (slide openings — formulaic but substantive). + +## Escalations (only the PO can decide) + +| E-ID | Question | Confidence | +|---|---|---| +| E-003 | Should the 3 "grounded (after P1)" targets with "production estates" scope be reclassified to `partial` (Cloud Spend precedent), or should "grounded" be redefined to mean "measurement pipeline grounded"? Changes a committed NORTH_STAR target's grounding label; requires NORTH_STAR-CHANGE trailer (REQ-204). | <0.60 | +| E-004 | Should AI-Agent Intent Share (≥40%) remain a "12–18mo Target" with no backing REQ/placeholder, or move to a "Future Horizons" section? Strategic-scope question (is agentic consumption a 12–18mo commitment or a longer horizon?). | <0.60 | + +## Overall verdict + +**🟡 REDUCE SCOPE / BINDING FIXES REQUIRED — not ready to ship as-is.** + +The plan is architecturally sound (metrics pipeline, Decision Ledger, +PowerBI export, x3 deck structure are well-designed and grounded). The +attestation clarification (G-Q3) is the best-propagated concept in the +plan. The regression-capability gate (CAP-023/024) is a credible safeguard. + +But the plan has one structural contradiction (NORTH_STAR:111 vs PO intent +vs grounding column) that infects 4 other findings (G-Q1, G-Q5, G-Q6, +G-Q9/slide 12). This is the v1.10 decay pattern (PRE_MORTEM FM-3) +repeating in the document meant to prevent it. The "no fabrication" hard +constraint is self-violated in two places (AI-Agent Intent Share placeholder +claim, derived-metrics-without-caveat) before a single slide is rendered. + +The deck plan is story-competent but not story-excellent. 4 benefit +callouts are filler, 3 transitions are hand-waved (incl. the critical +Act 3→4 boundary), slide 9 is the audience-loss slide, and the closing +ask is insider language. + +**12 binding decisions, 2 escalations.** None require re-architecting the +plan; all are edits to NORTH_STAR (2 rows + 1 line, with commit trailer), +the deck slide plan (4 slide rewrites, 1 split, 3 transition rewrites), +and one placeholder-view addition. Estimate: 1–2 phases of rework, not a +milestone restart. The plan does NOT need a revision loop — it needs +these 12 fixes applied in P0 (NORTH_STAR) and P5 (deck) before the +respective phases ship. Critical path unchanged. + +**Can the milestone proceed?** + +YES, once the 12 BIND decisions are incorporated (G-Q1/Q4/Q5/Q6 into P0 +NORTH_STAR + P5 deck plan; G-Q8/Q9/Q10/Q11/Q13/Q14/Q15/Q16 into P5 deck +plan). E-003/E-004 require PO decisions on NORTH_STAR target framing. +Confidence 0.80.