docs(ship): P5 complete → v1.27.5 (v1.28 docs-integration)
Nova Slides Render / render (push) Failing after 26s
Nova Slides Render / render (push) Failing after 26s
---ci--- project: acdl phase: 5 milestone: v1.28 status: complete ---/ci---
This commit is contained in:
@@ -1,20 +1,18 @@
|
||||
{
|
||||
"phase": 4,
|
||||
"phase": 5,
|
||||
"stage": "complete",
|
||||
"milestone": "v1.28",
|
||||
"phase_role": "execution",
|
||||
"attempts": 0,
|
||||
"updated_at": "2026-08-19T23:15:00Z",
|
||||
"updated_at": "2026-08-19T23:45:00Z",
|
||||
"project": "acdl",
|
||||
"projects": ["acdl", "nova-blockchain-exchange"],
|
||||
"active_milestone": "v1.28",
|
||||
"milestone_branch": "milestone/v1.28-cli-identity",
|
||||
"phase_branch": "phase/04-token-vend-pat",
|
||||
"phase_branch": "phase/05-docs-integration",
|
||||
"tag_line": "v1.27.x",
|
||||
"phase_name": "token-vend-pat",
|
||||
"reqs_covered": ["REQ-336", "REQ-337", "REQ-338", "REQ-339", "REQ-340", "REQ-341", "REQ-342", "REQ-343", "REQ-344"],
|
||||
"caps_verified": ["CAP-037", "CAP-038"],
|
||||
"tests": {"p4_specific": 54, "total_passing": 998, "failures": 0},
|
||||
"grill_conditions_resolved": ["C-6.1/C-7.1 ABAC fail-closed", "C-5.1 requested_claims shape", "C-7.3 cred file no raw PAT", "C-8.2 kj pinned", "C-2.1 P5 folded into P4 W8"],
|
||||
"notes": "v1.28 P4 SHIP. token-vend-pat complete (highest-risk, double-length, 8 waves). Tag v1.27.4. 9 REQs covered (REQ-336..344 + REQ-340/341 folded), CAP-037 + CAP-038 verified. ABAC fail-closed (7 tests), KMS ES256 DER->raw, JWKS, PAT lifecycle, nova auth, nova idp setup. 54 P4 tests + 998 total. Next: P5 docs-integration."
|
||||
"phase_name": "docs-integration",
|
||||
"reqs_covered": ["REQ-345", "REQ-346", "REQ-347", "REQ-348", "REQ-349", "REQ-350", "REQ-351"],
|
||||
"tests": {"p5_specific": 17, "total_passing": 1000, "failures": 0},
|
||||
"notes": "v1.28 P5 SHIP. docs-integration complete. Tag v1.27.5. 7 REQs covered (REQ-345..351). Operator guide (C-6.3), developer guide (C-7.3), threat model (C-6.2, C-9.2 INV audit), E2E test (REQ-348). 1000 tests passing. Next: P6 final-review-ship (milestone release)."
|
||||
}
|
||||
Reference in New Issue
Block a user