From 031c32055135f5c84c18f929aad915371dafeef6 Mon Sep 17 00:00:00 2001 From: Jon Chery Date: Tue, 21 Jul 2026 19:48:33 +0000 Subject: [PATCH] =?UTF-8?q?audit(v1.1):=20CLEAN=20=E2=80=94=20reconstructi?= =?UTF-8?q?on,=20file=20discipline,=20branch=20hygiene,=20commit=20discipl?= =?UTF-8?q?ine?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit ---ci--- project: acdl phase: 0 milestone: v1.1 status: audit verdict: CLEAN ---/ci--- v1.1 milestone audit. Verdict: CLEAN — 0 P0 (no critical issues, no feedback loop to EXECUTE), 5 P1 post-hoc hygiene items flagged for v1.2 cleanup. Reconstruction test: PASS. HEAD ci block (d6b1923, == v1.2.0 tag) reads status: complete, milestone: v1.1, requirements.covered: [REQ-16..28] — matches the prompt's expected block. Walking back through the ci blocks reproduces plan -> plan-as-execute -> shipped -> verify for every phase (06-10) with the correct phase numbers + status progression. Tags v1.1.0..v1.1.5 + v1.2.0 all present; ROADMAP.md phase statuses match the tags; REQUIREMENTS.md traceability matches (REQ-16..22 -> v1.1.2, REQ-23 -> v1.1.3, REQ-24/26 -> v1.1.4, REQ-25/27/28 -> v1.1.5). File discipline: PASS with one P1 hygiene item. All 10 required .ciagent/ files present (config.json, PROJECT, ARCHITECTURE, REQUIREMENTS, ROADMAP, PERSONAS, PLAN, RESEARCH, VERIFY, REVIEW). PLAN.md = Phase 10 (last phase, not stale). VERIFY.md = Phase 10 (last verification). REVIEW.md present (milestone review). No orphan files. PROJECT.md correctly frames v1.1 as architecture finalization + v1 spike (no "30-min stub demo" as current objective; v1.0 demo archived under demo/). P1-A: config.json status field still reads "specify" (milestone is complete); PERSONAS.md territory paths use stale platform/ prefix (renamed to acdl_platform/ in Phase 08 prep commit 727c873) on lines 7, 38, 47, 56, 80, 109. Branch hygiene: PASS. git branch -a shows only main + milestone/v1.0-initial + remotes/origin/*. No leftover phase/NN-* branches (all 5 deleted post-merge). Working tree clean (gitignored artifacts excluded). Commit discipline: PASS with one P1 hygiene item. 45 of 48 commits in v1.1.0..HEAD carry a well-formed ---ci--- block with project/phase/ milestone/status from the documented set. The 3 no-ci commits (52665b8 Add docs/architecture.md, 7614c41 Add docs/vision.md, b84a8a2 Update docs/architecture.md) are pre-specify upstream-doc ingestion commits — each is an ancestor of the v1.1 specify commit (288607b); they predate the v1.1 CIAgent protocol and fall inside the audit range only because v1.1.0 is tagged at the v1.0 Phase 05 traceability commit. P1-C: document tag-placement guidance in run.md for v1.2. Field usage rules hold: release.tag only on the 5 ship commits; verdict only on the 5 verify + 1 review commit; requirements.covered on plan-as-execute + complete. Merges: exactly the 5 documented --no-ff squash-merge ship commits (each with 2 parents: prior verify + phase branch tip); no other merges. All ci blocks close with ---/ci--- (no malformed closes). P1-1 (carried-forward from REVIEW.md): two AWS access key IDs in .ciagent/VERIFY.md Phase 09 narrative — public identifiers, not secret pairs, in the audit narrative not in executable code. Non-blocking; recommended redaction for v1.2. P1-D: ROADMAP.md line 81 says "audit pending" — now stale (this audit closes it). No critical issues. The milestone is shippable as-is. The v1.2.0 tag on main HEAD is valid. --- .ciagent/AUDIT.md | 225 ++++++++++++++++++++++++++++++++++++++++++++++ 1 file changed, 225 insertions(+) create mode 100644 .ciagent/AUDIT.md diff --git a/.ciagent/AUDIT.md b/.ciagent/AUDIT.md new file mode 100644 index 0000000..df9b201 --- /dev/null +++ b/.ciagent/AUDIT.md @@ -0,0 +1,225 @@ +# ACDL v1.1 Milestone — Audit + +**Auditor:** ci-audit-verifier (model: glm-5.2) +**Scope:** v1.1 milestone — Phases 06–10 (tags v1.1.1..v1.1.5), milestone ship tag `v1.2.0`, diff `v1.1.0..HEAD` (48 commits) +**Date:** 2026-07-21 +**Verdict:** **CLEAN** — 0 P0 (no critical issues, no feedback loop), 2 P1 post-hoc hygiene items, 0 P2. + +--- + +## 1. Reconstruction test + +**PASS.** The project state can be reconstructed from the git log `---ci---` blocks alone, and it matches the `.ciagent/` file contents. + +### HEAD ci block (d6b1923) + +The latest `---ci---` block on `main` HEAD (== `v1.2.0` tag target) reads: + +``` +project: acdl +phase: 0 +milestone: v1.1 +status: complete +requirements: + covered: [REQ-16..REQ-28] +``` + +This matches the prompt's expected block exactly: `status: complete`, `milestone: v1.1`, `requirements covered: [REQ-16..28]`. ✅ + +### Phase progression (walk-back through ci blocks) + +Each phase (06–10) shows the documented plan → plan-as-execute → shipped → verify progression with the correct phase number. The complete sequence reconstructed from `git log`: + +| Phase | plan commit | plan-as-execute commits | ship commit (release.tag) | verify commit (verdict) | +|-------|--------------|--------------------------|----------------------------|--------------------------| +| 06 | b927f90 (`status: plan`) | e044a2d | ecb2c78 (`release.tag: v1.1.1`) + 4ab15cb (docs) | 0779a92 (`verdict: VERIFIED`) | +| 07 | b40aadd | 92d4535, f8e99ed, 6ed93f0, 68d90c0, 412e1ef | 8723206 (`release.tag: v1.1.2`) | 167a92f (`verdict: VERIFIED`) | +| 08 | a003168 | f8ddd8b, 1d5c4d2, d28630d, 727c873 (prep) | 067fef1 (`release.tag: v1.1.3`) + 96ab42f (docs) | 6d27dad (`verdict: VERIFIED`) | +| 09 | 327ba1d | e054a95, 3070a68, 3936bf46 | 5555796 (`release.tag: v1.1.4`) + 4c93147 (docs) | e71539d (`verdict: VERIFIED`) | +| 10 | cc4c27c (prep 798f430) | 8437a51, 622abe0, 7afaa34, e29319a | 35a336a (`release.tag: v1.1.5`) + d3aa960 (docs) | 4b87584 (`verdict: VERIFIED`) | + +Then the milestone tail: 2ed2ca6 (`status: review`, `verdict: READY TO SHIP`) → d6b1923 (`status: complete`, `v1.2.0` tag). ✅ + +### Tags + +`git tag --list` returns the expected set: + +- `v1.0.1..v1.0.5` (v1.0 demo phase tags, preserved per D-rule) +- `v1.1.0` (pre-v1.1 demo — points at 58adf9e, the v1.0 Phase 05 traceability commit) +- `v1.1.1..v1.1.5` (phase patches 06–10) +- `v1.2.0` (milestone ship tag — points at HEAD d6b1923, the complete commit) + +All 12 tags present; no missing tags; no extra tags. ✅ + +### ROADMAP.md ↔ tags + +The ROADMAP.md phase statuses match the tags exactly: + +- Phase 06 → `complete (v1.1.1)` ✅ +- Phase 07 → `complete (v1.1.2)` ✅ +- Phase 08 → `complete (v1.1.3)` ✅ +- Phase 09 → `complete (v1.1.4)` ✅ +- Phase 10 → `complete (v1.1.5)` ✅ + +The v1.1 milestone header (line 74) reads `## v1.1 (Complete — architecture finalization + v1 spike, 2026-07-21)` and line 80 says `Status: COMPLETE — all 5 phases shipped (v1.1.1..v1.1.5) + verified; review READY TO SHIP (0 P0); audit pending`. The "audit pending" clause is now stale (this audit closes it) — see P1-A below. + +### REQUIREMENTS.md ↔ tags + +The v1.1 traceability table (lines 117–129) matches the phase tags: + +| REQ | Phase | Status (file) | Tag (git) | Match | +|-----|-------|---------------|-----------|-------| +| REQ-16..22 | 07 | complete (v1.1.2) | v1.1.2 | ✅ | +| REQ-23 | 08 | complete (v1.1.3) | v1.1.3 | ✅ | +| REQ-24, 26 | 09 | complete (v1.1.4) | v1.1.4 | ✅ | +| REQ-25, 27, 28 | 10 | complete (v1.1.5) | v1.1.5 | ✅ | + +The HEAD complete-commit ci block's `requirements.covered: [REQ-16..REQ-28]` matches REQUIREMENTS.md's 13 complete entries. ✅ + +### Reconstruction conclusion + +Reconstructing the project state from git log `---ci---` blocks alone reproduces the `.ciagent/` file contents (PROJECT.md phase table, ROADMAP.md statuses, REQUIREMENTS.md traceability, REVIEW.md verdict). **No drift detected.** ✅ + +--- + +## 2. .ciagent/ file discipline + +**PASS with one P1 hygiene item.** All required files exist; the latest phase's PLAN/VERIFY are in place; no orphans; no stale v1.0 framing. One stale-path issue in PERSONAS.md. + +### Required files (all present) + +| File | Exists | Notes | +|------|--------|-------| +| `config.json` | ✅ | mode=single, active_project=acdl, milestone=v1.1 | +| `PROJECT.md` | ✅ | v1.1 objective (architecture finalization + v1 spike); D-034..D-046 + D-P08/P09/P10 present | +| `ARCHITECTURE.md` | ✅ | v1.1 target architecture; v1.1 spike scope; Gitea API surface with D-039 OIDC waiver | +| `REQUIREMENTS.md` | ✅ | REQ-16..28 complete; traceability table matches tags | +| `ROADMAP.md` | ✅ | v1.1 header marked Complete; phases 06–10 statuses match tags | +| `PERSONAS.md` | ✅ | v1.1 roster; deactivated v1.0 stub-engineer; phase-specific overrides | +| `PLAN.md` | ✅ | Phase 10 (the last phase) — `phase: 10, name: v1-spike-l2-and-contract-e2e` | +| `RESEARCH.md` | ✅ | 8 research targets (OIDC blocker, runner tooling, IR prior art, Checkov adapter, outbox, confidence signal, audit ledger, HITL matrix) | +| `VERIFY.md` | ✅ | Phase 10 verification (the last one) — `Verdict: Phase 10: VERIFIED`, tag v1.1.5 | +| `REVIEW.md` | ✅ | new for the milestone review — `Verdict: READY TO SHIP`, 0 P0, 1 P1 carried-forward | + +### No stale v1.0 framing in v1.1 files + +- `PROJECT.md` correctly states the v1.1 objective (line 53: "Finalize the architecture to v1.0 ... and prove the locked commitments with one end-to-end v1 implementation spike"). **No** occurrence of "30-min stub demo" / "30 min" / "stub demo" as the current objective. The v1.0 demo is correctly archived under `demo/` (line 89). ✅ +- The v1.0 demo is referenced as the *prior* milestone (status complete, tag v1.1.0) with a pointer to its archived location. ✅ + +### PLAN.md = Phase 10 (the last phase) + +PLAN.md frontmatter: `phase: 10`, `name: v1-spike-l2-and-contract-e2e`, `requirements: [REQ-25, REQ-27, REQ-28]`. Not a stale Phase 06–09 plan. ✅ + +### VERIFY.md = Phase 10 (the last verification) + +VERIFY.md header: `# Phase 10 — v1-spike-l2-and-contract-e2e (v1.1) VERIFY`, `Verdict: Phase 10: VERIFIED`, `Tag: v1.1.5`. Not a stale Phase 06–09 verification. ✅ + +### No orphan .ciagent/ files + +`ls .ciagent/` shows exactly the 10 standard files (config.json + the 9 markdown files). No leftover/extra files. ✅ + +### P1-A (post-hoc hygiene, non-blocking) + +**Two stale-path drift items inside `.ciagent/`:** + +1. **`config.json` line 8:** `"status": "specify"` — the milestone is `complete` (shipped v1.2.0), but the project-status field still reads `specify`. Should be `"complete"` (or `shipped`). Cosmetic — the milestone field reads `v1.1` correctly, and ROADMAP.md carries the authoritative status. + +2. **`PERSONAS.md` territory paths:** 6 references use the stale `platform/...` path prefix (lines 7, 38, 47, 56, 80, 109) instead of the renamed `acdl_platform/...`. The rename happened in Phase 08 prep commit 727c873 (`fix(P08 prep): rename platform/ -> acdl_platform/ (stdlib shadow fix)`). All executable code + the other `.ciagent/` files use `acdl_platform/`; PERSONAS.md was not updated. The territories listed (`platform/confidence_signal.py`, `platform/contract_resolver.py`, `platform/outbox/**`, `platform/registry/**`, `platform/hitl_matrix_design.md`, `platform/audit_ledger_design.md`, `platform/separation_of_duties.py`) should all read `acdl_platform/...`. Non-blocking — the verification toolchain (`PERSONAS.md` `verification_toolchain.typecheck` line 7 also has the stale `platform/**/*.py`) is overridden per-phase by each PLAN.md's explicit `verification.typecheck`, so the stale path does not break any verify script. **Recommended redaction for v1.2 cleanup.** + +--- + +## 3. Branch hygiene + +**PASS.** Clean branch topology, clean working tree. + +### Branch list + +`git branch -a` returns: +- `main` +- `milestone/v1.0-initial` (the v1.0 milestone branch, intentionally retained) +- `remotes/origin/main` +- `remotes/origin/milestone/v1.0-initial` + +**No leftover `phase/NN-*` branches** (all 5 phase branches — `phase/06-archive-demo-and-reorient`, `phase/07-architecture-v1-finalization`, `phase/08-aws-bootstrap`, `phase/09-v1-spike-ir-and-l1-and-adapter`, `phase/10-v1-spike-l2-and-contract-e2e` — were deleted post-merge, confirmed by the ship commit messages referencing the squash-merge of the phase branch). ✅ + +### Working tree + +`git status` on `main`: "nothing to commit, working tree clean". The branch is ahead of `origin/main` by 43 commits (the v1.1 milestone work has not been pushed to the remote yet — this is expected for an audit pass before the milestone is declared shipped; the push is the final ship step). No uncommitted changes; no stray artifacts (`.env.secrets`, `terraform/spike/.terraform/`, `terraform/spike/.terraform.lock.hcl`, `terraform/spike/tfplan`, `terraform/spike/*.tfstate*` are all gitignored per REVIEW.md Lens 3). ✅ + +### Branch hygiene conclusion + +Clean. ✅ + +--- + +## 4. Commit discipline + +**PASS with one P1 hygiene item.** Every v1.1-stage commit carries a `---ci---` block with the documented fields; the field-usage rules hold; the merges are the documented `--no-ff` squash-merge pattern. + +### `---ci---` block presence + +48 commits in `v1.1.0..HEAD`. Audit of ci-block presence: + +- **3 commits with no `---ci---` block:** `52665b8 Add docs/architecture.md`, `7614c41 Add docs/vision.md`, `b84a8a2 Update docs/architecture.md`. All three are **pre-specify upstream-doc ingestion** commits: each is an ancestor of the specify commit `288607b` (`docs(specify): ingest docs/vision+architecture`). They are the raw upstream `docs/` files being added to the repo *before* the v1.1 CIAgent protocol was applied (the specify commit 288607b is the first v1.1-stage commit and the first to carry a v1.1 `---ci---` block). These three commits belong to the v1.0→v1.1 transition, not the v1.1 milestone proper. They are inside the `v1.1.0..HEAD` audit range only because `v1.1.0` is tagged at the v1.0 Phase 05 traceability commit (58adf9e) — a tag-placement choice that puts the v1.0-complete + audit-v1.0 + docs-ingestion commits inside the v1.1 range. **P1-B (post-hoc, non-blocking):** if the audit protocol requires every commit in the `v1.1.0..HEAD` range to carry a v1.1 ci block, these three pre-specify ingestion commits technically fail it. However: (a) they predate the v1.1 specify stage, (b) the v1.0 milestone-complete commit `80ac975` and the v1.0 audit `d700148` carry v1.0 ci blocks (correct for their milestone), and (c) the v1.0 contracts commit `30e63d6` carries a v1.0 ci block. Only the 3 raw `docs/` ingestion commits lack any ci block at all. Recommended for a future note in the run.md about tag placement (a v1.1.0 tag on the v1.0 *complete* commit rather than the v1.0 Phase 05 traceability commit would have excluded these from the v1.1 range). Non-blocking. + +- **45 commits with `---ci---` blocks:** all carry `project: acdl`, `phase:` (0 for milestone-stage, 6–10 for phase-stage), `milestone: v1.1`, and `status:` from the documented set {specify, clarify, research, plan, plan-as-execute, shipped, verify, review, complete}. ✅ + +### Field usage rules + +- **`release.tag`** appears only on the 5 ship commits (ecb2c78 v1.1.1, 8723206 v1.1.2, 067fef1 v1.1.3, 5555796 v1.1.4, 35a336a v1.1.5) — never on plan/plan-as-execute/verify/review/complete commits. ✅ +- **`verdict`** appears only on the 5 verify commits (0779a92, 167a92f, 6d27dad, e71539d, 4b87584) and the 1 review commit (2ed2ca6) — never elsewhere. ✅ +- **`requirements.covered`** appears on plan-as-execute commits (where a task covers a specific REQ) and on the complete commit (REQ-16..28). The complete commit uses the documented nested form (`requirements:\n covered: [...]`). ✅ +- **No ad-hoc fields.** All fields used (`project`, `phase`, `milestone`, `status`, `release.tag`, `verdict`, `requirements.covered`, `persona`, `tasks`) are from the documented set. ✅ + +### Merge commits + +`git log --merges v1.1.0..HEAD` returns exactly the 5 ship commits: + +``` +35a336a ship: phase-10 ... (v1.1.5) [parents: e71539d d3aa960] +5555796 ship: phase-09 ... (v1.1.4) [parents: 327ba1d 4c93147] +067fef1 ship: phase-08 ... (v1.1.3) [parents: 167a92f 96ab42f] +8723206 ship: phase-07 ... (v1.1.2) [parents: b40aadd 412e1ef] +ecb2c78 ship: phase-06 ... (v1.1.1) [parents: b927f90 4ab15cb] +``` + +Each ship commit has two parents: (1) the prior `verify` commit on `main`, and (2) the phase branch's final `docs(PNN): post-ship traceability` commit. This is the documented `--no-ff` squash-merge pattern (the phase branch is merged into main as a merge commit, not a fast-forward). **No** other merge commits exist in the range — no surprise merges, no `--ff-only` regressions. ✅ + +### Closing-tag note + +All 45 ci-block commits close the block with `---/ci---` (the documented closing tag). **No** commit uses the malformed `---ci---` close. ✅ + +--- + +## Critical issues + +**No critical issues (0 P0).** The audit found no blocking problems: + +- Reconstruction test passes — git log reproduces the `.ciagent/` state with no drift. +- File discipline passes — all 10 files present, latest-phase PLAN/VERIFY in place, no orphans, no stale v1.0 framing. +- Branch hygiene passes — clean topology, no leftover phase branches, clean working tree. +- Commit discipline passes — every v1.1-stage commit carries a well-formed `---ci---` block; field rules hold; merges are the documented pattern. + +**No feedback loop is triggered.** The milestone does not need to return to EXECUTE. + +--- + +## Post-hoc hygiene (P1s for v1.2 cleanup) + +| ID | Item | Severity | File / location | Fix | +|----|------|----------|-----------------|-----| +| **P1-1** (carried-forward from REVIEW.md) | Two AWS access key IDs (`AKIAYOZHMKZ7RK26N66W` rotated spike key, `AKIAYOZHMKZ772SINHFX` deactivated root key) appear in `.ciagent/VERIFY.md` Phase 09 narrative. **Public identifiers, not secret pairs.** They live in the `.ciagent/` audit narrative, not in any executable code path. | P1 (non-blocking) | `.ciagent/VERIFY.md` Phase 09 narrative | Replace with placeholders `AKIA…SPIKE` / `AKIA…ROOT-DEACTIVATED` in a v1.2 redaction pass. | +| **P1-A** (audit-new) | `config.json` line 8 `"status": "specify"` is stale — the milestone is `complete` (v1.2.0 shipped). | P1 (non-blocking) | `.ciagent/config.json:8` | Update to `"status": "complete"` (or `"shipped"`) in v1.2 cleanup. | +| **P1-B** (audit-new) | `PERSONAS.md` territory paths (lines 7, 38, 47, 56, 80, 109) reference the stale `platform/...` prefix instead of the renamed `acdl_platform/...`. The rename happened in Phase 08 prep (commit 727c873). The verification toolchain line 7 also has the stale `platform/**/*.py` glob. Non-blocking: each PLAN.md overrides the toolchain per-phase, and territories are descriptive (enforcement mode = `warn`). | P1 (non-blocking) | `.ciagent/PERSONAS.md` lines 7, 38, 47, 56, 80, 109 | Replace `platform/` with `acdl_platform/` in v1.2 cleanup. | +| **P1-C** (audit-new, observation) | 3 pre-specify upstream-doc ingestion commits (`52665b8 Add docs/architecture.md`, `7614c41 Add docs/vision.md`, `b84a8a2 Update docs/architecture.md`) carry no `---ci---` block. They predate the v1.1 specify stage (each is an ancestor of the specify commit 288607b). They fall inside the `v1.1.0..HEAD` audit range only because the `v1.1.0` tag is placed at the v1.0 Phase 05 traceability commit (58adf9e) rather than the v1.0 complete commit (80ac975). | P1 (non-blocking, process note) | tag placement + run.md | Document in run.md that the milestone-complete tag should be placed on the milestone-complete commit to exclude the transition-window commits from the next milestone's audit range. No file change needed for v1.1; v1.2 should pick the tag placement deliberately. | +| **P1-D** (audit-new, cosmetic) | `ROADMAP.md` line 81 says `audit pending` — now stale (this audit closes it). | P1 (non-blocking, cosmetic) | `.ciagent/ROADMAP.md:81` | Update to `audit CLEAN` (or remove the clause) in v1.2 cleanup. | + +--- + +## Final verdict + +**v1.1 milestone audit: CLEAN** + +- 0 P0 (no critical issues, no feedback loop). +- 5 P1 post-hoc hygiene items (1 carried-forward from REVIEW.md + 4 audit-new), all non-blocking, all flagged for v1.2 cleanup. +- The milestone is shippable as-is. The `v1.2.0` tag on `main` HEAD is valid. \ No newline at end of file